Trans-Texas Water Program: southeast area: draft technical memorandum: phase II program update

Date

1996

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Brown & Root, Inc.

Abstract

This report assesses the impact of the new planning information on the conclusions set forth in the original Phase I Report. The Phase I Report concluded that sufficient existing water supplies were present to meet future needs but that those available supplies were not in close proximity to the areas of highest water need. This report focuses on modifications to the Phase II program. These modifications include an increased effort in defining water quality issues associated with Sabine Lake, an increased analysis of the socio-economic impacts of interbasin transfer on exporting and importing basins, and a reduced effort associated with the definition of conceptual interbasin transfer routes from Sabine and Neches River basins.

Description

11 pgs.

Keywords

water supply, water resources development, water conservation

Citation