Evaluation of impingement data and potential impingement reduction alternatives for Cedar Bayou A intake
Date
1978
Authors
Envirosphere Company
Journal Title
Journal ISSN
Volume Title
Publisher
Envirosphere Company
Abstract
This study represents the result of Phase I of a two phase study of impingement at the Cedar Bayou Generating Station Intake Structure A. The purpose of this study is to review and analyze intake A & B impingement monitoring data and to identify and evaluate, from a consideration of engineering, environmental and economic factors, alternative designs or operating strategies having a potential for reducing impingement losses at intak A.
Description
179 pgs.
Keywords
water filters, biology, evaluation, pump stations, electric power plants, environmental aspects