Show simple item record

dc.creatorUnited States Army Engineer District, Galveston
dc.date.accessioned2010-09-08T19:43:41Z
dc.date.available2010-09-08T19:43:41Z
dc.date.issued1975-12
dc.identifier.otherAccession # 10619
dc.identifier.urihttp://hdl.handle.net/1969.3/27099
dc.descriptionApproximately 150 pagesen
dc.description.abstractThis report presents the results of Phase I post authorization planning studies of the authorized Mouth of Colorado River, Texas project. The primary purpose of the authorized project is to provide safe and dependable navigation between the Gulf of Mexico and the Gulf Intracoastal Waterway (GIWW). The objectives of the Phase I studies have been to reevaluate the previous findings and conclusions in light of current conditions and to confirm the authorized plan or formulate a suitable alternative. These studies have resulted in the reformulation of the authorized project.en
dc.language.isoen_USen
dc.publisherUnited States Army Engineer District, Galvestonen
dc.subjectGulf Intracoastal Waterwayen
dc.subjectColorado River, Texasen
dc.subjectchannel dredgingen
dc.subjectnavigationen
dc.titleMouth of Colorado River, Texas - Phase I, General Design Memorandum - DRAFTen
dc.typeTechnical Reporten
dc.locationGBIC Special Collection
dc.call-noSPEC COLL GBAY ACC#10619


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record