Final feasibility report and environmental impact statement. Galveston Bay area navigation study. Volume 4: Appendix D - engineering design and costs.

Date

1988

Authors

U.S. Army Corps of Engineers, Galveston District.

Journal Title

Journal ISSN

Volume Title

Publisher

U.S. Army Corps of Engineers, Galveston District

Abstract

This appendix presents the results of several engineering investigations. Section 2.0 develops appropriate design criteria for the study area. These criteria are applied to produce a range of possible channel dimensions which are used as input to Plan Formulation (Appendix B). Section 4.0 presents the design details and costs for disposal plan alternatives in the Galveston Bay reach of the HSC, drawing on informaiton developed in other sections of this report.

Description

ARCHIVAL MATERIAL. 286 p.

Keywords

navigational channels, legislation, environmental impact, economic analysis, economics, cost analysis, engineering, navigation, development projects, planning, resource development, marine transportation, channel maintenance

Citation